Anyone in Krefeld who wants to buy or renovate a house, an apartment or a plot usually looks for the “Bauamt” (building authority). In the city administration, this means several departments with separate tasks. This guide shows which office is responsible for what, where to find the development plan and land use plan online, how building applications and preliminary inquiries work, and how to check Baulasten and building records before buying.

Illustration (AI generated): Linn Castle with a round keep and narrow moat · stylized according to photo reference

Brief answers

  • There is no single “Bauamt” in Krefeld. Building applications, preliminary decisions, Baulasten and building records are handled by Department 63 Building Supervision (Fachbereich 63 Bauaufsicht); land-use planning is handled by Department 61 Urban and Transport Planning (Fachbereich 61 Stadt- und Verkehrsplanung). Both are located at Oberschlesienstraße 16, 47807 Krefeld.
  • The city publishes all legally binding development plans, the land use plan and the planning-related bylaws free of charge in the Bauen und Planen (building and planning) geoportal. The original certified document of the development plan remains legally authoritative.
  • Since September 1, 2026, building applications must be submitted electronically (Section 70 BauO NRW). A preliminary decision is valid for three years. In Krefeld, Baulasten information costs €30 per unencumbered parcel and €50 per Baulast, up to a maximum of €150 per encumbered parcel.
Content · Sections: 10
  1. 01Krefeld building authority: which department is responsible for what
  2. 02Viewing the development plan in Krefeld: the Bauen und Planen geoportal
  3. 03Krefeld land use plan (Flächennutzungsplan): what it shows and what it doesn't
  4. 04Krefeld development plan, Section 34 or Section 35 BauGB: what applies to the plot
  5. 05Building application in Krefeld: submitting electronically and compiling the documents
  6. 06Preliminary inquiry in Krefeld: preliminary decision under Section 77 BauO NRW
  7. 07Krefeld Baulasten information: costs and procedure under Section 85 BauO NRW
  8. 08Inspecting building records in Krefeld: the building supervision records archive
  9. 09New development plans in Krefeld: public display and participation
  10. 10Checklist before buying in Krefeld

By Serhii Panchenko · Software development and editorial work. General information, not advice on your individual circumstances.

01Krefeld building authority: which department is responsible for what

In North Rhine-Westphalia, the lower building supervisory authorities include the independent cities (Section 57(1) BauO NRW). In Krefeld, this is Department 63 Building Supervision. According to the city, it is responsible for building permit and building enforcement procedures. Development plans, by contrast, are drawn up by Department 61 Urban and Transport Planning.

City of Krefeld offices responsible for building matters

Office
Department 63 Building Supervision (Bauaufsicht)
Tasks
Building application, building permit, preliminary decision, permit exemption, Baulasten register, building records archive
Access
Office hours Tuesdays and Thursdays 8:30 a.m. to 12:30 p.m., online appointment booking
Office
Department 61 Urban and Transport Planning (Stadt- und Verkehrsplanung)
Tasks
Land use plan, preparation and amendment of development plans, development freezes, public display of draft plans
Access
Ask about the status of a procedure by email, inspect documents during the public display
Office
Department 62 Surveying, Cadastre and Real Estate (Vermessung, Kataster und Liegenschaften)
Tasks
Development plan information, printouts and files of original plan documents, extract from the cadastral map
Access
By phone or in person after a short appointment arranged by phone
Source: City of Krefeld, krefeld.de and service.krefeld.de, accessed 10/31/2026 · As of 10/2026

All three departments are located in the Technical City Administration building at Oberschlesienstraße 16 in Krefeld-Fischeln, with vehicle access via Kimplerstraße. A directory sorted by street in the service portal shows which case officer at the building supervision office is responsible for your plot.

Building advice currently limited

On the Department 63 page, the city states that the Bauinfo-Büro (building information office) is temporarily closed for staffing reasons and that no building advice sessions are currently taking place. The city advises against informal written inquiries, including by email, because questions can only be reviewed and answered with legal certainty through a preliminary inquiry or a building application. Check the current status on krefeld.de before visiting.

02Viewing the development plan in Krefeld: the Bauen und Planen geoportal

The City of Krefeld publishes its development plans, the land use plan and the planning-related bylaws online via the Bauen und Planen geoportal. According to the city, information, use of the geoportal and downloading the data are free of charge. Fees may apply if you order large-format printouts or an additional data delivery.

  1. 1Open the geoportalOpen the Bauen und Planen geoportal via krefeld.de. By default, it shows the areas covered by development plans, distinguished as legally binding, in progress and historical.
  2. 2Find the plotUse the search field at the top left to search by street and address or directly by the number or name of a development plan. To search by Gemarkung, Flur and Flurstück (cadastral district, section and parcel), use the parcel search.
  3. 3Check the plan contentZoom in: the plan content and provisions are only displayed at larger scales. Where linked, also open the written provisions and the explanatory statement.

The geoportal also shows the landscape plan, listed buildings and heritage areas, as well as standard land values from BORIS NRW. This lets buyers check planning law, heritage protection and land value in one place.

Good to know

The city does not guarantee the content in the geoportal. The provisions of the original certified development plan document are legally authoritative. If it is not yet linked in the geoportal, you can order it for a fee as a file or large-format printout from the development plan information service in Department 62.

03Krefeld land use plan (Flächennutzungsplan): what it shows and what it doesn't

The land use plan is drawn up for the entire city area and shows the intended land use. The City of Krefeld describes it as a guiding plan with a time horizon of about 15 years. It is not parcel-specific and is binding on authorities but not on individuals. Development plans must be derived from it. According to the explanatory statements of municipal development plans, Krefeld's current land use plan has been in effect since October 23, 2015.

You will also find it in the Bauen und Planen geoportal. According to the city, amendments to the land use plan must be approved by the Düsseldorf district government (Bezirksregierung Düsseldorf). A designation as a residential building area does not, as a rule, create a right to build, but it shows how an area is meant to develop.

04Krefeld development plan, Section 34 or Section 35 BauGB: what applies to the plot

According to the city, Department 63 Building Supervision assesses case by case whether a plot is in a built-up area or the outer area and which projects are permitted.

Three locations, three benchmarks under the Building Code

Location
Within the area covered by a development plan
Benchmark
Section 30 BauGB
What this usually means
Permitted if the project does not conflict with the provisions and access to public infrastructure is secured
Location
Contiguously built-up area without a development plan
Benchmark
Section 34 BauGB
What this usually means
The project must fit into the character of the immediate surroundings in terms of type and intensity of use, type of construction and built-up area
Location
Outer area (Außenbereich)
Benchmark
Section 35 BauGB
What this usually means
Only certain projects are given preferential approval, for example for agricultural or forestry businesses; an ordinary residential house usually is not
Source: Sections 30, 34, 35 Building Code (BauGB) · As of 10/2026

For built-up areas without a plan, the city gives a rule of thumb: if the existing buildings are uniform, the framework is narrow; the more varied the building structures, the greater the leeway. According to Department 61, Krefeld is not currently preparing any bylaws for built-up areas or outer areas (Innenbereichs- or Außenbereichssatzungen).

If you are looking for a vacant lot, you can use the city's building land register (Baulandkataster). It shows plots that can be built on immediately for residential use under a development plan or Section 34 BauGB, but without guarantee, without assurance that they can be built on and without information on contamination, for example.

05Building application in Krefeld: submitting electronically and compiling the documents

Since September 1, 2026, Section 70(1) BauO NRW requires building applications to be submitted electronically to the lower building supervisory authority. On its service page, the City of Krefeld asks applicants to send digital building applications by email to the building supervision office and accepts attachments only in PDF format. For the simplified building permit procedure, it also links to the digital building application via Bauportal.NRW.

  1. 1Form and descriptionBuilding application form for the relevant procedure and a building description; for commercial projects, an operating description. The city offers form assistants for completing and printing them.
  2. 2Site plan and cadastral mapSite plan at a scale of at least 1:500. For projects under Section 34 or Section 35 BauGB, also a certified extract from the cadastral map no older than six months, unless an official site plan is provided.
  3. 3Drawings and calculationsFloor plans, sections and elevations at a scale of 1:100, cost estimate details and, depending on the project, setback areas, living area, parking spaces, as well as GRZ, GFZ and full stories.
  4. 4Tree protection and certificatesDeclaration under the tree protection bylaw, except for changes of use and interior alterations, plus certificates such as structural stability and thermal, sound and fire protection.

As a rule, an architect or engineer authorized to submit building documents (bauvorlageberechtigt) must also sign; according to the city, this can be waived for garages, dormers or patio roofs. The building supervision office checks within ten working days whether the application is complete (Section 71(1) BauO NRW). It generally decides on the application within three months, or within six weeks in the simplified procedure, counted from receipt of complete documents (Section 74(2) BauO NRW). The building permit expires if construction has not started within three years or has been interrupted for more than one year (Section 75(1) BauO NRW).

Permit exemption in a development plan area

If the project is within the area of a qualified development plan and complies with its provisions, a permit exemption under Section 63 BauO NRW may be an option. According to the city, you may start construction if you are not notified otherwise within one month of receipt of the complete documents. As a rule, no fees are charged for processing; an early notification or confirmation by the municipality costs €50 each.

06Preliminary inquiry in Krefeld: preliminary decision under Section 77 BauO NRW

With a preliminary inquiry (Bauvoranfrage), you can have individual questions clarified with binding effect before the building application, for example whether a plot may be built on with a house at all under Section 34 BauGB. The preliminary decision is valid for three years; on request in text form, the period can be extended by up to one year each time (Section 77(1) BauO NRW). The City of Krefeld points out that the preliminary decision is only binding if the later building application corresponds to it.

Preliminary building decision in Krefeld at a glance

Point
Required documents
Information
Application form with the preliminary decision box checked, site plan, depending on the question building drawings, building description and cost estimate; for Sections 34 and 35 BauGB also the cadastral map and an extract from the official base map at 1:5,000
Point
Design author
Information
Required for buildings, unless only the type of use, type of construction and buildable area of the plot are being reviewed (Section 77(2) BauO NRW)
Point
Processing time
Information
According to the city, six weeks to four months with complete documents; other authorities comment within two months
Point
Fee
Information
According to the city, at least €50, depending on scope up to 100 percent of the fee for a building permit
Source: City of Krefeld, applying for a preliminary building decision; Section 77 BauO NRW · As of 10/2026

07Krefeld Baulasten information: costs and procedure under Section 85 BauO NRW

A Baulast is a public-law obligation that an owner assumes toward the building supervisory authority, for example to tolerate an access route or setback area for the neighboring plot. It becomes effective upon entry in the Baulasten register and is also binding on future owners (Section 85(1) BauO NRW). As a rule, it does not appear in the land register. Anyone who demonstrates a legitimate interest may inspect the register and obtain an extract (Section 85(5) BauO NRW).

  1. 1Submit an applicationYou apply for the information from the Baulasten information service of Department 63, also online. You must state the street and house number, Gemarkung, Flur and Flurstück, and your address for the fee notice.
  2. 2Budget for the fee€50 per existing Baulast, up to a maximum of €150 per encumbered parcel; €30 for an unencumbered parcel.
  3. 3Allow for postal deliveryThe information is issued only in writing and sent only by post, not by email or fax. The city states a processing time of three weeks plus postal delivery.

08Inspecting building records in Krefeld: the building supervision records archive

The building records archive of Department 63 holds permit files for completed and inspected building projects, as well as for permits that were not used before they expired. On request, the city provides digital extracts from building records electronically if you are the owner or present a power of attorney. Experts need an appointment by a court or a power of attorney from the owners.

The application must be accompanied by proof of ownership, a power of attorney if applicable, and a declaration assuming the costs. Fees are based on the NRW General Administrative Fee Ordinance and the city's fee bylaw; the service page does not state a fixed amount. If nothing can be found in the archive, the city says it cannot help further. So ask the seller first for the building permit and the approved plans.

09New development plans in Krefeld: public display and participation

A development plan is adopted by the city council as a bylaw and enters into force upon publication (Section 10 BauGB); in Krefeld, this appears in the official gazette (Amtsblatt). Before that, the public is involved (Section 3 BauGB). According to the city, early public participation takes place through a posted notice or a public event. Later, the drafts and explanatory statement are put on public display for one month; during this time, anyone can submit comments.

The city lists ongoing public participation procedures and public displays on its participation portal at beteiligung.nrw.de. You can ask the land-use planning team of Department 61 by email about the status of a procedure. To safeguard planning, the city council can adopt a development freeze (Veränderungssperre). According to the city, projects approved beforehand, for example by a positive preliminary decision, are not affected.

10Checklist before buying in Krefeld

What is permitted and what has been approved has a major impact on a property's value. As a rule, check the following before notarization:

  1. 1Planning lawUse the Bauen und Planen geoportal to clarify whether a development plan applies, and look at the provisions, the land use plan and heritage protection.
  2. 2BaulastenApply for written Baulasten information and allow for postal delivery time so that the result is available before the notary appointment.
  3. 3Building recordsWith the owner's power of attorney, request an extract from the building records and check whether conversions such as an attic conversion or an extension have been approved.
  4. 4Ongoing proceduresCheck the participation portal to see whether a development plan is being drawn up or amended nearby.
  5. 5Preliminary decisionIf a new building or major conversion is planned, a preliminary decision before buying can provide certainty. Clarify with the notary's office how this can be taken into account in the purchase contract.

DDORF WOHNEN does not provide information on the building rights of individual plots. Only the City of Krefeld's building supervision office decides with binding effect.

Frequently asked questions

F-01

Where is the building authority in Krefeld?

Departments 63 Building Supervision and 61 Urban and Transport Planning are located in the Technical City Administration building, Oberschlesienstraße 16, 47807 Krefeld. The building supervision office has office hours on Tuesdays and Thursdays from 8:30 a.m. to 12:30 p.m.; appointments are booked online.

F-02

Where can I view the development plan in Krefeld?

Free of charge in the City of Krefeld's Bauen und Planen geoportal. Expert information is provided by the development plan information service in Department 62, by phone or in person by appointment. The original certified document of the development plan is legally authoritative.

F-03

How do I submit a building application in Krefeld?

Since September 1, 2026, building applications must be submitted electronically. The city accepts digital building applications with PDF attachments at the building supervision office and links to Bauportal.NRW for the simplified procedure. As a rule, an architect or engineer authorized to submit building documents signs the application.

F-04

How much does Baulasten information cost in Krefeld?

According to the city, €30 for an unencumbered parcel and €50 per existing Baulast, up to a maximum of €150 per encumbered parcel. The information is sent only by post; processing takes about three weeks plus postal delivery.

F-05

How long is a preliminary building decision valid in Krefeld?

Three years. On request in text form, the period can be extended by up to one year each time (Section 77(1) BauO NRW). In Krefeld, the fee is at least €50.

F-06

How do I get the building records for my house in Krefeld?

From the building records archive of Department 63, also online. Owners or authorized representatives receive a digital extract with proof of ownership and a declaration assuming the costs. The fee is based on the administrative fee ordinance.

F-07

What applies if there is no development plan for my plot?

In a built-up area, Section 34 BauGB applies: the project must fit into the character of the immediate surroundings. In the outer area, Section 35 BauGB applies. In Krefeld, the building supervision office assesses whether a plot belongs to the built-up area or the outer area.

No legal or tax advice

This guide provides a general overview and does not replace legal or building advice. The development plan, applicable building law and the decision of the building authority are authoritative.

Next steps and background

Data sources

Official source · Our own calculation · Our own analysis · DDORF estimate → Methodology

  • Official sourceStadt Krefeld: Fachbereich 63 BauaufsichtTasks, location, office hours, note on the Bauinfo-Büro, building records archiveAccessed 10/31/2026View source(opens new window)
  • Official sourceStadt Krefeld: Fachbereich 61 Stadt- und VerkehrsplanungLand-use planning, building land register, participation portalAccessed 10/31/2026View source(opens new window)
  • Official sourceStadt Krefeld: Bauleitplanverfahren und BebauungspläneLand use plan, procedural steps, built-up and outer areas, development freezeAccessed 10/31/2026View source(opens new window)
  • Official sourceStadt Krefeld: GeoportaleBauen und Planen geoportal, specialist data, search, note on the original plan documentAccessed 10/31/2026View source(opens new window)
  • Official sourceServiceportal Krefeld: Bebauungspläne, Auskünfte und PlanungsunterlagenDevelopment plan information service in Department 62, feesAccessed 10/31/2026View source(opens new window)
  • Official sourceServiceportal Krefeld: Bauantrag stellenDigital building application, PDF attachments, Bauportal.NRW, documentsAccessed 10/31/2026View source(opens new window)
  • Official sourceServiceportal Krefeld: Baugenehmigung beantragenRequired documents, period of validityAccessed 10/31/2026View source(opens new window)
  • Official sourceServiceportal Krefeld: Bauvorbescheid beantragenDocuments, processing time, fee rangeAccessed 10/31/2026View source(opens new window)
  • Official sourceServiceportal Krefeld: GenehmigungsfreistellungRequirements, one-month period, feesAccessed 10/31/2026View source(opens new window)
  • Official sourceServiceportal Krefeld: Baulastenverzeichnis, Auskunft beantragenRequired details, fees, delivery, processing timeAccessed 10/31/2026View source(opens new window)
  • Official sourceServiceportal Krefeld: BauaktenauskunftBuilding records archive, digital extracts, documentsAccessed 10/31/2026View source(opens new window)
  • Official sourceServiceportal Krefeld: Bauleitplanung, Verfahrensstand erfragenLand-use planning team in Department 61Accessed 10/31/2026View source(opens new window)
  • Official sourceBeteiligungsportal der Stadt KrefeldOngoing public participation procedures and public displaysAccessed 10/31/2026View source(opens new window)
  • Official sourceStadt Krefeld: Begründung zum Bebauungsplan Nr. 784Land use plan in effect since October 23, 2015ris.krefeld.deAccessed 10/31/2026View source(opens new window)
  • Official sourceBauportal.NRWBuilding application and preliminary building decision in North Rhine-WestphaliaAccessed 10/31/2026View source(opens new window)
  • Official sourceBaugesetzbuchSection 3 public participationgesetze-im-internet.deView source(opens new window)
  • Official sourceBaugesetzbuchSection 10 adoption and entry into force of the development plangesetze-im-internet.deView source(opens new window)
  • Official sourceBaugesetzbuchSection 30 permissibility within the scope of a development plangesetze-im-internet.deView source(opens new window)
  • Official sourceBaugesetzbuchSection 34 Projects within contiguously built-up areasgesetze-im-internet.deView source(opens new window)
  • Official sourceBaugesetzbuchSection 35 building in the outer areagesetze-im-internet.deView source(opens new window)
  • Official sourceLandesbauordnung 2018 NRWSection 57 building supervisory authorities · Section 63 permit exemption · Sections 70, 71 building application · Sections 74, 75 building permit · Section 77 preliminary decision · Section 85 Baulastenrecht.nrw.deView source(opens new window)

As of · Legal information: 10/2026 · Source: DDORF WOHNEN editorial team