01Wuppertal building office: which department is responsible for what
Wuppertal's administration has no office actually called “Bauamt” (building office). The term usually refers to Department 105 Building and Housing within the Urban Development, Building and Mobility division. According to the city's organization chart, it is split into urban land-use planning (105.1), building law (105.2), building subsidies and housing (105.3) and monument protection (105.4).
Some information that buyers need comes instead from Department 102 Surveying, Land Registry and Geodata. According to the city, it provides information on existing development plans and keeps the Baulasten register. Both departments list Johannes-Rau-Platz 1, 42275 Wuppertal, the Barmen town hall, as their address.
Responsible offices of the City of Wuppertal
- Matter
- Drawing up new development plans and the land use plan
- Responsible office
- Department 105 Building and Housing, urban land-use planning (105.1)
- How to proceed
- Participation procedures and public notices on wuppertal.de
- Matter
- Information on existing development plans, printed copies
- Responsible office
- Department 102, Geodata Center and planning law register extracts
- How to proceed
- Online-B-Plan-Auskunft, written order or appointment
- Matter
- Building advice, building application, preliminary decision
- Responsible office
- Department 105, building law (105.2), Citizens' Building Advice (105.21)
- How to proceed
- Bauportal.NRW, consultation hours or appointment
- Matter
- Information from the Baulasten register
- Responsible office
- Department 102, Baulasten register
- How to proceed
- Online ordering assistant, in writing or in person by appointment
- Matter
- Viewing old building files
- Responsible office
- Building files citizen service (old files archive) of the building authority
- How to proceed
- Online application in the city's service portal
02Viewing the Wuppertal development plan: the Online-B-Plan-Auskunft
A development plan contains the legally binding provisions for urban planning order (Section 8(1) BauGB). In Wuppertal, the city council adopts it as a bylaw.
The city publishes its development plans in its own map application, the Online-B-Plan-Auskunft, which also works on smartphones and tablets. According to the city, the legal basis for publishing them online is Section 10a BauGB. The PDF download is free of charge. According to the city, as of 09/2026 the supplementary procedural documents are also available for around 97 percent of procedures.
- 1Open the Online-B-Plan-AuskunftYou will find the link on wuppertal.de on the “Bebauungspläne” page in the planning procedures section or in the service “Bebauungspläne (B-Plan): Online-Auskunft”.
- 2Search by address or plan numberEnter an address, a development plan number or a well-known place in the search field at the bottom left of the map window. Results appear as transparent colored areas with the plan number.
- 3Download the documentsThe “Dokumente” link in the info box opens the document viewer. There you can download individual PDF files or a zip archive with all documents.
Good to know
03Wuppertal land use plan: the 2005 legal plan and the working map
The land use plan shows the intended land use for the entire municipal area in broad outline (Section 5(1) BauGB). Development plans must generally be derived from it (Section 8(2) BauGB). As a rule, no right to build on an individual plot follows from the land use plan.
Wuppertal's land use plan took legal effect with its publication on January 17, 2005. Since then, the city has continuously amended it for individual sub-areas. In the Online-FNP-Auskunft, also called FNP-Inspektor on the city's website, you can see the legal plan as of 2005 and display the boundaries of all amendment procedures with their documents.
There is also an informal working map with the updated main uses. Extracts from the planning law register are available from the Geodata Center.
04Planning law in brief: Sections 30, 34 and 35 BauGB
If a qualified development plan applies to the plot, a project is permissible under Section 30(1) BauGB if it does not contradict the plan's provisions and access and utilities are secured. If a simple development plan contains only individual provisions, permissibility is otherwise governed by Section 34 or Section 35 BauGB (Section 30(3) BauGB).
If the Online-B-Plan-Auskunft shows no area for your address, there is generally no development plan there. In a built-up district, a project is then permissible under Section 34(1) BauGB if it fits into the character of the immediate surroundings in terms of type and extent of use, type of construction and built-on plot area, and if access and utilities are secured. The townscape must not be impaired.
If the plot is in the outer area, only certain projects are privileged under Section 35(1) BauGB, for example those serving an agricultural or forestry operation. Other projects can only be approved in individual cases under Section 35(2) BauGB if they do not impair public interests. This question can be clarified bindingly with a preliminary decision.
05Wuppertal building application: electronically via Bauportal.NRW
Since September 1, 2026, Section 70(1) BauO NRW requires building applications to be submitted electronically to the lower building authority. Since that day, the Wuppertal building authority has accepted building applications, preliminary building inquiries and notifications in building law procedures via Bauportal.NRW. According to its own announcement, it has processed the simplified and the standard permit procedures fully digitally since October 1, 2026.
According to the city, procedures that do not yet run through the Bauportal are submitted via the City of Wuppertal's service portal. Building documents must be in PDF format, with a maximum of 30 MB per file and 250 MB per application.
- 1Use the initial consultationThe Citizens' Building Advice service at the Barmen town hall clarifies whether your project requires a permit, which procedure is needed and which building documents are required. It is available without an appointment on Mondays, Tuesdays and Thursdays from 8 a.m. to 12 p.m. and additionally on Thursdays from 2 p.m. to 4 p.m.
- 2Wait for the completeness checkAccording to the city, the Citizens' Building Advice service checks the application for formal completeness within 10 working days.
- 3Processing by Team East or WestOnce the documents are complete, the technical building team East or West takes over further processing, depending on where the plot is located, and is then your point of contact.
Procedures at the building authority in North Rhine-Westphalia
- Procedure
- Preliminary decision
- For what
- Clarify individual questions bindingly before the building application
- Key rules
- Valid for three years, extendable on request in text form by up to one year at a time (Section 77(1) BauO NRW)
- Procedure
- Simplified building permit procedure
- For what
- All projects except large special buildings (Section 64 BauO NRW)
- Key rules
- Decision within six weeks of complete building documents and statements; deemed approval unless the building owner waives it in text form (Section 74(2) and (3) BauO NRW)
- Procedure
- Building permit procedure
- For what
- Large special buildings (Section 65 BauO NRW)
- Key rules
- Decision within three months (Section 74(2) BauO NRW)
- Procedure
- Permit exemption (Genehmigungsfreistellung)
- For what
- Projects within the scope of a development plan under Section 30(1) or (2) BauGB that comply with its provisions
- Key rules
- Construction may generally start one month after the documents are received, unless the municipality requires a procedure (Section 63(3) BauO NRW)
Fees are based on the General Administrative Fee Ordinance NRW. In its example, the city calculates 13 per mille of the shell construction value for erecting a building and 13 per mille of the construction costs for an alteration.
06Preliminary building inquiry in Wuppertal: preliminary decision under Section 77 BauO NRW
With a preliminary decision, you clarify individual questions on construction, alteration or change of use in a legally binding way before filing the full building application. A typical question for buyers is whether a residential building is permissible on a plot at all or whether an attic may be converted.
In Wuppertal, the application for a preliminary decision is also filed digitally via Bauportal NRW. If the questions concern the construction or alteration of a building, the building documents must come from a person authorized to submit building documents. Under Section 77(2) BauO NRW, this does not apply if only the type of use, the type of construction and the buildable plot area are to be decided.
Watch the deadlines
07Wuppertal Baulasten information: the Baulasten register
A Baulast is a public-law obligation of the owner toward the building authority to do, refrain from or tolerate something on their property. It takes effect upon entry in the Baulasten register (Section 85(1) BauO NRW) and does not appear in the land register.
In Wuppertal, Department 102 keeps the Baulasten register and provides information on existing Baulasten. The lower building authority in Department 105 is responsible for entering new Baulasten. You can find out whether any Baulasten are registered at all without proof. For extracts and information on their content, you must demonstrate a legitimate interest (Section 85(5) BauO NRW). According to the city, those entitled include owners, prospective buyers, future land charge creditors, notaries and design authors.
Fees for information from the Wuppertal Baulasten register
- Type of information
- In-person inspection, verbal or telephone information on whether a Baulast exists
- Fee per property
- free of charge
- Type of information
- Written extract, no Baulast registered
- Fee per property
- €30
- Type of information
- Online self-service download with up to two Baulasten
- Fee per property
- €50
- Type of information
- Online self-service download with three or more Baulasten
- Fee per property
- €75
- Type of information
- PDF extract sent by email by the Baulasten register
- Fee per property
- €50 to €125, depending on the number of Baulasten
- Type of information
- Printed extract by mail or in person
- Fee per property
- €50 to €200, depending on the number of Baulasten
In the online ordering assistant, you upload meaningful proof of your legitimate interest and receive the certificate as a PDF. The city's map service offers a first look online, with a color display of encumbered and benefiting parcels. In-person inspection takes place by appointment in the new building, room C-055.
08Viewing building files in Wuppertal: the building authority's old files archive
The lower building authority's old files archive contains closed building files from 1945 onward. According to the city, files on buildings constructed before 1945 were largely destroyed in the war. If there is no file, you receive a negative notice; the basic fee is charged anyway.
For data protection reasons, only the owner may view the files. To verify identity, the city requires a land register extract and a valid ID document. Prospective buyers therefore generally need a power of attorney or a declaration of consent from the seller. The application is made exclusively online via the City of Wuppertal's service portal, for example with the online ID function or an Elster certificate.
After the search, depending on the file, you receive the documents as a PDF or can book an appointment online to view them on site. Fees are based on the City of Wuppertal's administrative fee schedule and depend on the scope of the inspection.
09New development plans in Wuppertal: public participation
The city publishes ongoing procedures on its development plan page under “Frühzeitige Beteiligungen der Öffentlichkeit” (early public participation) and “Veröffentlichung von Bebauungsplänen und Änderungen von Flächennutzungsplänen” (publication of development plans and land use plan amendments). Plans that have entered into force are announced in the customary local manner (Section 10(3) BauGB), in Wuppertal under the official public notices.
Under Section 3(2) BauGB, draft plans and their explanatory statements are published online for one month, at least 30 days, and are also made accessible via a central state internet portal. Late statements may be disregarded when the decision is made.
10Checklist for buyers: Wuppertal development plan and building authority
What is permitted on a plot and what has already been approved has a considerable effect on a property's value. Before notarization, buyers in Wuppertal should generally check these points:
- 1Planning lawLook up the address in the Online-B-Plan-Auskunft and download the plan drawing, written provisions and explanatory statement. Without a development plan, Section 34 or Section 35 BauGB generally applies.
- 2Land use plan and ongoing proceduresCheck the designation and possible amendment procedures in the FNP-Inspektor, and look at the city's participation procedures for new plans in the area.
- 3BaulastenAsk the Baulasten register whether any Baulasten are registered. As a prospective buyer, you can request an extract with their content if you provide proof.
- 4Building recordsAsk the seller for a power of attorney for the old files archive or for existing permits.
- 5Open questionsClarify uncertain building plans with the Citizens' Building Advice service and, if necessary, with a preliminary decision. Discuss with the notary's office whether a right of withdrawal or a condition in the purchase contract makes sense.
DDORF WOHNEN does not provide information on the building law status of individual plots. Only the building authority of the City of Wuppertal decides bindingly.
Frequently asked questions
Where is the building office in Wuppertal?
Department 105 Building and Housing, with urban land-use planning and the building authority, is located at Johannes-Rau-Platz 1, 42275 Wuppertal, in the Barmen town hall. The Citizens' Building Advice service can also be reached there.
Where can I view the development plan in Wuppertal?
In the city's Online-B-Plan-Auskunft. You search by address or plan number and download the plan free of charge as a PDF. Printed copies and information are available from the Geodata Center in Department 102.
How much does a development plan cost in Wuppertal?
Downloading and viewing are free of charge. Under Department 102's fee schedule, a complete paper plan costs €30 to €60 and a DIN A4 excerpt €7.50, plus shipping costs for mail delivery.
How do I submit a building application in Wuppertal?
Electronically via Bauportal.NRW. The Citizens' Building Advice service checks the application for completeness, after which the technical building team East or West processes it. Procedures not yet covered by the Bauportal run through the city's service portal.
How long is a preliminary building decision valid in NRW?
Three years. Upon application in text form, the period can be extended by up to one year at a time (Section 77(1) BauO NRW).
How much does Baulasten information cost in Wuppertal?
Inspection and verbal information on whether a Baulast exists are free of charge. A written extract costs €30 per property without a Baulast and €50 to €200 depending on the number of Baulasten and the delivery method.
Who may view building files in Wuppertal?
Only the owner with a land register extract and ID, or an authorized representative. The application is made online via the city's service portal.
No legal or tax advice
This guide provides a general overview and does not replace legal or building advice. The development plan, applicable building law and the decision of the building authority are authoritative.
Next steps and background
- Düsseldorf development planDevelopment plan, building authority and Baulasten in the state capitalOpen ›
- Calculate GRZ and GFZCalculate permitted footprint and floor area from the development planOpen ›
- Wuppertal land registry officeLand register extract, costs and appointment at the local courtOpen ›
- Wuppertal standard land valueOfficial values from BORIS NRWOpen ›
- Wuppertal property pricesPut purchase prices and market data for Wuppertal into contextOpen ›
- Additional purchase costsCalculate real estate transfer tax, notary and land registry costsOpen ›
Data sources
Official source · Our own calculation · Our own analysis · DDORF estimate → Methodology
- Official sourceStadt Wuppertal: Ressort 105 Bauen und WohnenAddress and structure: urban land-use planning, building law, building subsidies and housing, monument protectionView source(opens new window)
- Official sourceStadt Wuppertal: Bürgerberatung BauenAdvice, acceptance and preliminary review of applications, consultation hoursView source(opens new window)
- Official sourceBauaufsicht Wuppertal: Beratung und GenehmigungSubmission via Bauportal.NRW from 09/01/2026, teams East and West, file inspectionView source(opens new window)
- Official sourceBauaufsicht Wuppertal: Bauanträge ab Oktober komplett onlineDigital processing, project room, service portalView source(opens new window)
- Official sourceStadt Wuppertal: VorbescheidApplication, building documents, deadlines and file formatsView source(opens new window)
- Official sourceStadt Wuppertal: BaugenehmigungsverfahrenProcedure and fees under AVwGebO NRWView source(opens new window)
- Official sourceStadt Wuppertal: BebauungspläneOnline-B-Plan-Auskunft, FNP information, participation proceduresView source(opens new window)
- Official sourceStadt Wuppertal: Bebauungspläne Auskunft und VerkaufResponsibilities of Departments 102 and 105, fees, open dataView source(opens new window)
- Official sourceStadt Wuppertal: Bebauungspläne Online-AuskunftFree PDF download, Section 10a BauGB, licenseView source(opens new window)
- Official sourceStadt Wuppertal: FlächennutzungsplanLegally effective since 01/17/2005, amendment procedures, working mapView source(opens new window)
- Official sourceStadt Wuppertal: BaulastenverzeichnisLegitimate interest, fees, online ordering, inspectionView source(opens new window)
- Official sourceStadt Wuppertal: Bürgerservice BauaktenOld files archive from 1945, eligibility, online applicationView source(opens new window)
- Official sourceBaugesetzbuchSection 3 public participationView source(opens new window)
- Official sourceBaugesetzbuchSection 5 land use plan · Section 8 development plan · Section 10 bylaw · Section 10a publicationView source(opens new window)
- Official sourceBaugesetzbuchSection 30 permissibility within the scope of a development planView source(opens new window)
- Official sourceBaugesetzbuchSection 34 Projects within contiguously built-up areasView source(opens new window)
- Official sourceBaugesetzbuchSection 35 building in the outer areaView source(opens new window)
- Official sourceLandesbauordnung 2018 NRWSection 63 permit exemption · Sections 64, 65 permit procedures · Section 70 building application · Sections 74, 75 building permit · Section 77 preliminary decision · Section 85 BaulastenView source(opens new window)
