Kirschenweg 11+13 – new build in Hilden

As of: 11 November 2026

in planning · 12 apartments

Illustration (AI generated): Reformation Church and Alter Markt in Hilden · elevated view stylized according to photo reference
Own compilation

About the project

The housing cooperative Gemeinnütziger Bauverein Hilden eG is planning a replacement new build at Kirschenweg 11 and 13 in Hilden: an existing semi-detached house with two flats will give way to two six-family buildings with twelve flats in total. The plans include two- and three-room flats of roughly 54 to 85 m², each with a terrace, garden or balcony; ground-floor flats are barrier-free. There will be 16 parking spaces and an above-ground bicycle garage. The buildings are to reach at least the KfW Efficiency House 55 standard and use air-to-water heat pumps and photovoltaics, with solar power supplied to tenants under a tenant-electricity model. The cooperative lists the project as "in preparation". It has not yet published construction or completion dates or rents.

Project page of the developer (Gemeinnütziger Bauverein Hilden eG)

New-build projects

Project facts

Each line names its source and the date on which we checked the fact there. If a line is missing, no source has published that fact.

Project facts

Item
Developer
Value
Gemeinnütziger Bauverein Hilden eGPartners: EINHUNDERT Solar GmbH / EINHUNDERT Energie GmbH – Mieterstrom-Modell
Item
Location
Value
Hilden, Kirschenweg 11 und 13
Item
Apartments
Value
12 (Two six-family buildings replacing a semi-detached house with two flats; approx. 886 m² living space in total)
Source
Gemeinnütziger Bauverein Hilden eGchecked 11 November 2026
Item
Apartment types
Value
2–3 rooms
Source
Gemeinnütziger Bauverein Hilden eGchecked 11 November 2026
Item
Living space
Value
54 m² to 85 m²
Source
Gemeinnütziger Bauverein Hilden eGchecked 11 November 2026
Item
Project stage
Value
in planning · Listed by the cooperative as "in preparation"; heating decision (air-to-water heat pumps) taken in August 2026, tenant-electricity contracts signed in June 2026
Item
Energy standard
Value
At least KfW Efficiency House 55; air-to-water heat pumps, decentralised instantaneous water heaters, photovoltaics with tenant electricity
Source
Gemeinnütziger Bauverein Hilden eGchecked 11 November 2026

No individual listings: we do not show individual apartments, floor plans, photos or prices per apartment. Only the provider can confirm whether apartments are still available, what they cost and when they will be completed.

MaBV · § 556f BGB · WBS

Context

The project is still in planning. Number of units, apartment mix and dates may change until the building permit; what counts is the current status at the city and the developer.

New-build projects

More new-build projects in Hilden

More new-build projects in Hilden

Location
Hilden
Developer
Gemeinnütziger Bauverein Hilden eG
Units
7
Type
–
Stage
planning
Completion
–

Is a fact wrong or out of date? Report content