Lupinenfeld (Wiesenviertel) – new build in Düsseldorf-Lichtenbroich
completed · rental apartments / subsidized housing (geförderter Wohnungsbau) · 32 apartments

About the project
The housing cooperative DüBS has built two multi-family buildings with 32 barrier-free rental apartments in the Wiesenviertel of Düsseldorf-Lichtenbroich, between Volkardeyer Weg and Wittlaerer Weg. They replace eight older row houses with twelve homes, raising the living space to about 2,300 m². The apartments have two to five rooms with a balcony, roof terrace or garden. Four are publicly subsidised, six are rent-capped and the rest are privately financed. Construction ran from summer 2024 to winter 2025/26; the buildings were handed over in January 2026, when the first tenants moved in. Technology includes a heat pump, photovoltaics and smart building controls. No efficiency standard is stated.
Project page of the developer (Düsseldorfer Bau- und Spargenossenschaft eG (DüBS))
Project facts
Each line names its source and the date on which we checked the fact there. If a line is missing, no source has published that fact.
Project facts
- Item
- Developer
- Value
- Düsseldorfer Bau- und Spargenossenschaft eG (DüBS)
- Source
- Düsseldorfer Bau- und Spargenossenschaft eG (DüBS)Düsseldorf Aktuellchecked 11 November 2026
- Item
- Location
- Value
- Düsseldorf-Lichtenbroich, zwischen Volkardeyer Weg und Wittlaerer Weg (Wiesenviertel)
- Source
- Düsseldorfer Bau- und Spargenossenschaft eG (DüBS)Düsseldorf Aktuellchecked 11 November 2026
- Item
- Type
- Value
- rental apartments / subsidized housing (geförderter Wohnungsbau)
- Source
- Düsseldorfer Bau- und Spargenossenschaft eG (DüBS)Düsseldorf Aktuellchecked 11 November 2026
- Item
- Apartments
- Value
- 32 (32 barrier-free rental apartments in two multi-family buildings (replacing eight row houses); 4 publicly subsidised, 6 rent-capped; about 2,300 m² of living space)
- Source
- Düsseldorfer Bau- und Spargenossenschaft eG (DüBS)Düsseldorf Aktuellchecked 11 November 2026
- Item
- Subsidized apartments
- Value
- 4
- Source
- Düsseldorfer Bau- und Spargenossenschaft eG (DüBS)checked 11 November 2026
- Item
- Apartment types
- Value
- 2–5 rooms
- Source
- Düsseldorfer Bau- und Spargenossenschaft eG (DüBS)Düsseldorf Aktuellchecked 11 November 2026
- Item
- Project stage
- Value
- completed · Completed; handed over to DüBS and first tenants moved in in January 2026, fully let immediately
- Source
- Düsseldorfer Bau- und Spargenossenschaft eG (DüBS)checked 11 November 2026
- Item
- Completion according to source
- Value
- Construction from summer 2024 to winter 2025/26, handover January 2026
- Source
- Düsseldorfer Bau- und Spargenossenschaft eG (DüBS)checked 11 November 2026
- Item
- Energy standard
- Value
- Air-source heat pump, photovoltaics, ventilation system, EV wallboxes, smart building technology, green roofs; no efficiency standard stated
- Source
- Düsseldorfer Bau- und Spargenossenschaft eG (DüBS)Düsseldorf Aktuellchecked 11 November 2026
No individual listings: we do not show individual apartments, floor plans, photos or prices per apartment. Only the provider can confirm whether apartments are still available, what they cost and when they will be completed.
Context
The rent cap (Mietpreisbremse) does not apply to new apartments first let after 1 October 2014 (§ 556f BGB). If a graduated or index-linked rent is offered, calculate it over several years before signing.
For the subsidized apartments you need a housing entitlement certificate (WBS). They are allocated directly by the housing company; register there as a home seeker.
More new-build projects in Düsseldorf
More new-build projects in Düsseldorf
- Location
- Eller
- Developer
- Vivawest GmbH
- Units
- 259
- Type
- rental apartments / subsidized housing (geförderter Wohnungsbau)
- Stage
- under construction
- Completion
- Mid-2028, first occupancy fall 2028
- Project
- Mosaik (Grafental)
- Location
- Flingern-Nord
- Developer
- Instone Real Estate Development GmbH
- Units
- 215
- Type
- for sale and for rent
- Stage
- under construction
- Completion
- Q3 2028
- Location
- Golzheim
- Developer
- SWD Städtische Wohnungsgesellschaft Düsseldorf
- Units
- 215
- Type
- rental apartments / subsidized housing (geförderter Wohnungsbau)
- Stage
- under construction
- Completion
- 2028
- Project
- Elisabethstraße (SWD)
- Location
- Unterbilk
- Developer
- SWD Städtische Wohnungsgesellschaft Düsseldorf
- Units
- 190
- Type
- rental apartments / subsidized housing (geförderter Wohnungsbau)
- Stage
- under construction
- Completion
- Summer 2028
- Project
- nyoo Grafental Ost
- Location
- Flingern-Nord
- Developer
- Nyoo Real Estate GmbH (Instone-Gruppe)
- Units
- 167
- Type
- –
- Stage
- under construction
- Completion
- –
- Location
- Lierenfeld
- Developer
- SWD Städtische Wohnungsgesellschaft Düsseldorf
- Units
- 154
- Type
- rental apartments / subsidized housing (geförderter Wohnungsbau)
- Stage
- under construction
- Completion
- First 33 apartments and daycare center from December 2026, all apartments by H1 2027
Is a fact wrong or out of date? Report content
Data sources
Official source · Our own calculation · Our own analysis · DDORF estimate → Methodology
- Company sourceDüsseldorfer Bau- und Spargenossenschaft eG (DüBS)housing companyView source(opens new window)
- Third party sourceDüsseldorf AktuellpressView source(opens new window)