New-build project · Düsseldorf

Lupinenfeld (Wiesenviertel) – new build in Düsseldorf-Lichtenbroich

As of: 11 November 2026

completed · rental apartments / subsidized housing (geförderter Wohnungsbau) · 32 apartments

Illustration (AI generated): St. Mary Queen in Düsseldorf-Lichtenbroich. AI-generated architectural illustration based on photo reference of the parish · stylized based on photo reference
Location: Düsseldorf-Lichtenbroich
Open Data Düsseldorf · dl-de/zero-2.0
Own compilation

About the project

The housing cooperative DüBS has built two multi-family buildings with 32 barrier-free rental apartments in the Wiesenviertel of Düsseldorf-Lichtenbroich, between Volkardeyer Weg and Wittlaerer Weg. They replace eight older row houses with twelve homes, raising the living space to about 2,300 m². The apartments have two to five rooms with a balcony, roof terrace or garden. Four are publicly subsidised, six are rent-capped and the rest are privately financed. Construction ran from summer 2024 to winter 2025/26; the buildings were handed over in January 2026, when the first tenants moved in. Technology includes a heat pump, photovoltaics and smart building controls. No efficiency standard is stated.

Project page of the developer (Düsseldorfer Bau- und Spargenossenschaft eG (DüBS))

New-build projects

Project facts

Each line names its source and the date on which we checked the fact there. If a line is missing, no source has published that fact.

Project facts

Item
Developer
Value
Düsseldorfer Bau- und Spargenossenschaft eG (DüBS)
Item
Location
Value
Düsseldorf-Lichtenbroich, zwischen Volkardeyer Weg und Wittlaerer Weg (Wiesenviertel)
Item
Type
Value
rental apartments / subsidized housing (geförderter Wohnungsbau)
Item
Apartments
Value
32 (32 barrier-free rental apartments in two multi-family buildings (replacing eight row houses); 4 publicly subsidised, 6 rent-capped; about 2,300 m² of living space)
Item
Subsidized apartments
Value
4
Item
Apartment types
Value
2–5 rooms
Item
Project stage
Value
completed · Completed; handed over to DüBS and first tenants moved in in January 2026, fully let immediately
Item
Completion according to source
Value
Construction from summer 2024 to winter 2025/26, handover January 2026
Item
Energy standard
Value
Air-source heat pump, photovoltaics, ventilation system, EV wallboxes, smart building technology, green roofs; no efficiency standard stated

No individual listings: we do not show individual apartments, floor plans, photos or prices per apartment. Only the provider can confirm whether apartments are still available, what they cost and when they will be completed.

MaBV · § 556f BGB · WBS

Context

The rent cap (Mietpreisbremse) does not apply to new apartments first let after 1 October 2014 (§ 556f BGB). If a graduated or index-linked rent is offered, calculate it over several years before signing.

For the subsidized apartments you need a housing entitlement certificate (WBS). They are allocated directly by the housing company; register there as a home seeker.

New-build projects

More new-build projects in Düsseldorf

More new-build projects in Düsseldorf

Location
Eller
Developer
Vivawest GmbH
Units
259
Type
rental apartments / subsidized housing (geförderter Wohnungsbau)
Stage
under construction
Completion
Mid-2028, first occupancy fall 2028
Location
Flingern-Nord
Developer
Instone Real Estate Development GmbH
Units
215
Type
for sale and for rent
Stage
under construction
Completion
Q3 2028
Location
Golzheim
Developer
SWD Städtische Wohnungsgesellschaft Düsseldorf
Units
215
Type
rental apartments / subsidized housing (geförderter Wohnungsbau)
Stage
under construction
Completion
2028
Location
Unterbilk
Developer
SWD Städtische Wohnungsgesellschaft Düsseldorf
Units
190
Type
rental apartments / subsidized housing (geförderter Wohnungsbau)
Stage
under construction
Completion
Summer 2028
Location
Flingern-Nord
Developer
Nyoo Real Estate GmbH (Instone-Gruppe)
Units
167
Type
–
Stage
under construction
Completion
–
Location
Lierenfeld
Developer
SWD Städtische Wohnungsgesellschaft Düsseldorf
Units
154
Type
rental apartments / subsidized housing (geförderter Wohnungsbau)
Stage
under construction
Completion
First 33 apartments and daycare center from December 2026, all apartments by H1 2027

Is a fact wrong or out of date? Report content

Data sources

Official source · Our own calculation · Our own analysis · DDORF estimate → Methodology

As of · Source: developers, cities and press