About the project

Construction of an apartment building has begun on a formerly city-owned plot at Gartenstraße 4 in Jüchen-Hochneukirch. The client is Gebrüder Maaßen Grundstücks-eGbR from Mönchengladbach, and the design is by architect Ralf Voullié. According to a City of Jüchen press release of 4 November 2026, the building will contain eleven apartments with two to four rooms and roughly 60 to 140 m², about 980 m² of living space in total, plus an underground garage with eleven parking spaces. It is being built in solid masonry to the Effizienzhaus 40 standard, with an air-to-water heat pump and a photovoltaic system. The apartments are expected to be handed over to future tenants in mid-2028.

New-build projects

Project facts

Each line names its source and the date on which we checked the fact there. If a line is missing, no source has published that fact.

Project facts

Item
Developer
Value
Gebrüder Maaßen Grundstücks-eGbRPartners: Ralf Voullié (Architekt)
Source
Stadt Jüchenchecked 11 November 2026
Item
Location
Value
Jüchen-Hochneukirch, Gartenstraße 4
Source
Stadt Jüchenchecked 11 November 2026
Item
Type
Value
rental apartments
Source
Stadt Jüchenchecked 11 November 2026
Item
Apartments
Value
11 (11 apartments with a total of approx. 980 m² of living space, underground garage with 11 spaces)
Source
Stadt Jüchenchecked 11 November 2026
Item
Apartment types
Value
2–4 rooms
Source
Stadt Jüchenchecked 11 November 2026
Item
Living space
Value
60 m² to 140 m²
Source
Stadt Jüchenchecked 11 November 2026
Item
Project stage
Value
under construction · Groundbreaking, City of Jüchen press release of 4 Nov 2026
Source
Stadt Jüchenchecked 11 November 2026
Item
Completion according to source
Value
Handover to tenants expected in mid-2028
Source
Stadt Jüchenchecked 11 November 2026
Item
Energy standard
Value
Effizienzhaus 40, air-to-water heat pump, photovoltaic system, solid masonry construction
Source
Stadt Jüchenchecked 11 November 2026

No individual listings: we do not show individual apartments, floor plans, photos or prices per apartment. Only the provider can confirm whether apartments are still available, what they cost and when they will be completed.

MaBV · § 556f BGB · WBS

Context

The rent cap (Mietpreisbremse) does not apply to new apartments first let after 1 October 2014 (§ 556f BGB). If a graduated or index-linked rent is offered, calculate it over several years before signing.

Is a fact wrong or out of date? Report content

Data sources

Official source · Our own calculation · Our own analysis · DDORF estimate → Methodology

As of · Source: developers, cities and press