Mehrfamilienhaus Gartenstraße 4 – new build in Jüchen-Hochneukirch
under construction · rental apartments · 11 apartments

About the project
Construction of an apartment building has begun on a formerly city-owned plot at Gartenstraße 4 in Jüchen-Hochneukirch. The client is Gebrüder Maaßen Grundstücks-eGbR from Mönchengladbach, and the design is by architect Ralf Voullié. According to a City of Jüchen press release of 4 November 2026, the building will contain eleven apartments with two to four rooms and roughly 60 to 140 m², about 980 m² of living space in total, plus an underground garage with eleven parking spaces. It is being built in solid masonry to the Effizienzhaus 40 standard, with an air-to-water heat pump and a photovoltaic system. The apartments are expected to be handed over to future tenants in mid-2028.
Project facts
Each line names its source and the date on which we checked the fact there. If a line is missing, no source has published that fact.
Project facts
- Item
- Developer
- Value
- Gebrüder Maaßen Grundstücks-eGbRPartners: Ralf Voullié (Architekt)
- Source
- Stadt Jüchenchecked 11 November 2026
- Item
- Location
- Value
- Jüchen-Hochneukirch, Gartenstraße 4
- Source
- Stadt Jüchenchecked 11 November 2026
- Item
- Type
- Value
- rental apartments
- Source
- Stadt Jüchenchecked 11 November 2026
- Item
- Apartments
- Value
- 11 (11 apartments with a total of approx. 980 m² of living space, underground garage with 11 spaces)
- Source
- Stadt Jüchenchecked 11 November 2026
- Item
- Apartment types
- Value
- 2–4 rooms
- Source
- Stadt Jüchenchecked 11 November 2026
- Item
- Living space
- Value
- 60 m² to 140 m²
- Source
- Stadt Jüchenchecked 11 November 2026
- Item
- Project stage
- Value
- under construction · Groundbreaking, City of Jüchen press release of 4 Nov 2026
- Source
- Stadt Jüchenchecked 11 November 2026
- Item
- Completion according to source
- Value
- Handover to tenants expected in mid-2028
- Source
- Stadt Jüchenchecked 11 November 2026
- Item
- Energy standard
- Value
- Effizienzhaus 40, air-to-water heat pump, photovoltaic system, solid masonry construction
- Source
- Stadt Jüchenchecked 11 November 2026
No individual listings: we do not show individual apartments, floor plans, photos or prices per apartment. Only the provider can confirm whether apartments are still available, what they cost and when they will be completed.
Context
The rent cap (Mietpreisbremse) does not apply to new apartments first let after 1 October 2014 (§ 556f BGB). If a graduated or index-linked rent is offered, calculate it over several years before signing.
Is a fact wrong or out of date? Report content
Data sources
Official source · Our own calculation · Our own analysis · DDORF estimate → Methodology
- Official sourceStadt JüchencityView source(opens new window)