New-build project · Meerbusch

LEBENSWERT LANK – new build in Meerbusch-Lank-Latum

As of: 10 November 2026

under construction · condominiums for sale · 98 apartments

Illustration (AI generated): Old church tower in Büderich · stylized according to official photo references, not a photograph · stylized according to photo references
Own compilation

About the project

In Meerbusch-Lank-Latum, WILMA Immobilien is building the LEBENSWERT LANK quarter at Uerdinger Straße 123. Plans include 68 owner-occupied apartments of about 36 to 120 m² in six apartment buildings, plus 30 semi-detached and terraced houses of roughly 144 to 157 m². Work begins with ten semi-detached houses in the rear part of the site, accessed from Gelleper Straße; the construction start was reported in October 2026. The developer gives autumn 2027 as completion for the first phase. Buildings follow the Effizienzhaus 40 standard with air-source heat pumps and photovoltaics with battery storage. A footpath and cycle path links Uerdinger Straße with the rear section.

Project page of the developer (WILMA Immobilien)

New-build projects

Project facts

Each line names its source and the date on which we checked the fact there. If a line is missing, no source has published that fact.

Project facts

Item
Developer
Value
WILMA Immobilien
Source
WILMA Immobilienkoniichecked 10 November 2026
Item
Location
Value
Meerbusch-Lank-Latum, Uerdinger Straße 123 / Gelleper Straße
Source
WILMA Immobilienkoniichecked 10 November 2026
Item
Type
Value
condominiums for sale
Source
WILMA Immobilienchecked 10 November 2026
Item
Apartments
Value
98 (68 condominiums in 6 multi-family buildings + 30 semi-detached and row houses)
Source
WILMA Immobilienchecked 10 November 2026
Item
Apartment types
Value
2–5 rooms; semi-detached houses and row houses
Source
WILMA Immobilienchecked 10 November 2026
Item
Living space
Value
36 m² to 157 m²
Source
WILMA Immobilienchecked 10 November 2026
Item
Project stage
Value
under construction · Construction start October 2026 (konii 22.10.2026); foundations of the first 10 semi-detached houses (WILMA, 10/2026)
Source
WILMA Immobilienkoniichecked 10 November 2026
Item
Completion according to source
Value
Fall 2027 (phase 1)
Source
WILMA Immobilienchecked 10 November 2026
Item
Energy standard
Value
Effizienzhaus 40, air-source heat pumps, solar PV with storage
Source
WILMA Immobilienchecked 10 November 2026

No individual listings: we do not show individual apartments, floor plans, photos or prices per apartment. Only the provider can confirm whether apartments are still available, what they cost and when they will be completed.

MaBV · § 556f BGB · WBS

Context

Buying an apartment here from the developer means signing a developer contract (Bauträgervertrag) with payments according to construction progress. Check the building specification, payment plan and completion date in the draft contract, and budget the real estate transfer tax, notary and land registry fees on the full purchase price.

New-build projects

More new-build projects in Meerbusch-Lank-Latum

More new-build projects in Meerbusch-Lank-Latum

Location
Osterath
Developer
Ten Brinke Wohnungsbau
Units
31
Type
condominiums for sale
Stage
on the market
Completion
Summer 2026 (planned)
Location
Büderich
Developer
BPD Immobilienentwicklung GmbH
Units
400
Type
for sale and for rent
Stage
planning
Completion
–