Neues Stadtquartier Dormagen-Horrem – 1. Bauabschnitt – new build in Dormagen-Horrem

As of: 10 November 2026

under construction · rental apartments · 126 apartments

Illustration (AI generated): Rhine Gate and Customs Tower with adjacent chapel in Zons, Dormagen · stylized according to photo reference
Own compilation

About the project

In Dormagen-Horrem, Baugenossenschaft Dormagen is building the first phase of its new urban quarter on Kastanienweg. Four buildings with 126 apartments and about 10,465 m² of living space are being built as cooperative rental housing. Following the topping-out ceremony at the end of June, the cooperative reported in October 2026 that the first buildings have roofs and windows and interior work has started in building 1. The buildings follow the Effizienzhaus 40 standard with air-source heat pumps, photovoltaics with battery storage and green roofs. The overall quarter holds the KlimaQuartier.NRW label and will grow in several phases of new build and renovation. BGD gives no completion date.

Project page of the developer (Baugenossenschaft Dormagen eG (BGD))

New-build projects

Project facts

Each line names its source and the date on which we checked the fact there. If a line is missing, no source has published that fact.

Project facts

Item
Developer
Value
Baugenossenschaft Dormagen eG (BGD)
Item
Location
Value
Dormagen-Horrem, Kastanienweg
Item
Type
Value
rental apartments
Source
Baugenossenschaft Dormagen eGchecked 10 November 2026
Item
Apartments
Value
126 (Phase 1 (four buildings, approx. 10.465 m² of living space); the neighborhood is being built in several phases)
Source
Baugenossenschaft Dormagen eGchecked 10 November 2026
Item
Project stage
Value
under construction · Topping-out end of June; interior finishing started in building 1 (BGD report 02.10.2026)
Item
Energy standard
Value
Effizienzhaus 40, air-source heat pumps, solar PV with storage, green roofs (KlimaQuartier.NRW)

No individual listings: we do not show individual apartments, floor plans, photos or prices per apartment. Only the provider can confirm whether apartments are still available, what they cost and when they will be completed.

MaBV · § 556f BGB · WBS

Context

The rent cap (Mietpreisbremse) does not apply to new apartments first let after 1 October 2014 (§ 556f BGB). If a graduated or index-linked rent is offered, calculate it over several years before signing.

Is a fact wrong or out of date? Report content