Düsseldorf building authority (Bauamt): Bauaufsichtsamt, building applications, Baulasten and building records at a glance

Updated on 10 November 2026 · 10 min read

Anyone in Düsseldorf who wants to convert a house, build on a plot or buy a property ends up searching for the “Bauamt”. What is usually meant is the Building Supervision Office of the state capital. This guide shows how to reach the office, how building applications and preliminary inquiries work, which projects are permit-free, what Baulasten information and building records cost and when the monument authority has a say. As of 11/2026.

Illustration (AI generated): Rhine promenade with the Rheinturm and Rheinkniebrücke · stylised from a photo reference

Brief answers

  • The “Bauamt” in Düsseldorf is the Building Supervision Office (Bauaufsichtsamt, Office 63) at Brinckmannstraße 5. It decides on building applications and preliminary inquiries and keeps the register of building encumbrances (Baulastenverzeichnis) and the building records archive. The lower monument protection authority is also part of the office.
  • The first point of contact is the telephone initial advice service (Erstberatung) at 0211 89-22999, Monday to Friday from 8 a.m. to 2 p.m. On-site or video appointments are available by arrangement. The initial advice service does not answer whether a specific project can be approved.
  • Since September 1, 2026, building applications must be submitted electronically (§ 70 BauO NRW); the city refers applicants to Bauportal.NRW. Information from the Baulasten register costs €30 per unencumbered and €50 to €150 per encumbered parcel; providing a building file (Hausakte) costs €55.
Content · Sections: 10
  1. 01Bauamt Düsseldorf: the Building Supervision Office and its divisions
  2. 02Address, initial advice and appointments at the Building Supervision Office
  3. 03Building application in Düsseldorf: electronically via Bauportal.NRW
  4. 04Building without a permit in Düsseldorf: permit-free projects under § 62 BauO NRW
  5. 05Preliminary inquiry at the Düsseldorf Building Supervision Office: preliminary decision under § 77 BauO NRW
  6. 06Fees at the Düsseldorf Building Supervision Office
  7. 07Baulasten information in Düsseldorf: geoportal and written extract
  8. 08Inspecting building records in Düsseldorf: building files from the records archive
  9. 09Monument protection in Düsseldorf: the lower monument protection authority within the Building Supervision Office
  10. 10Neighbors, construction noise and defects: when the Building Supervision Office helps

By Serhii Panchenko · Software development and editorial work. General information, not advice on your individual circumstances.

01Bauamt Düsseldorf: the Building Supervision Office and its divisions

Lower building supervision authorities in North Rhine-Westphalia include the independent cities (§ 57(1) BauO NRW). In the state capital Düsseldorf this task is performed by the Building Supervision Office, listed in the administration as Office 63. There is no office called “Bauamt”. Development plans are not drawn up by the Building Supervision Office but by the Urban Planning Office (Stadtplanungsamt).

Structure of the Düsseldorf Building Supervision Office

Section
Division 1
Tasks according to the city
Administration, central services, building records archive, building law matters
Section
Division 2
Tasks according to the city
General approval procedures
Section
Division 3
Tasks according to the city
Complex special buildings and supervision procedures
Section
Division 4
Tasks according to the city
Institute for Monument Protection and Preservation (lower monument protection authority)
Source: City of Düsseldorf, Building Supervision Office, contacts, accessed 11/10/2026 · As of 11/2026

Tasks are divided by subject area, not by city district. Who handles your project in a given case is clarified by the initial advice service; according to the city, it also forwards callback requests to the responsible caseworker.

02Address, initial advice and appointments at the Building Supervision Office

The Building Supervision Office is located at Brinckmannstraße 5 in 40225 Düsseldorf; the city gives Brinckmannstraße 5, 40200 Düsseldorf as its postal address. As the central application intake, the city names Auf'm Hennekamp 45, 40225 Düsseldorf, ground floor, room 20.

How to reach the Düsseldorf Building Supervision Office

Kontaktweg
Initial advice by phone
Information
0211 89-22999, Monday to Friday 8:00 a.m. to 2:00 p.m.
Kontaktweg
Email
Information
bauaufsichtsamt@duesseldorf.de, stating the street and house number of the property and your contact details
Kontaktweg
Telefax
Information
Fax 0211 89-29083
Kontaktweg
Advice on site or by video
Information
By prior arrangement by phone or e-mail
Kontaktweg
Bus and rail
Information
Stop Auf'm Hennekamp (U71, U73, U83, 704, 706); S-Bahn D-Volksgarten or D-Bilk
Source: City of Düsseldorf, contact page and service portal initial advice, accessed 11/10/2026 · As of 11/2026

According to the city, the initial advice service answers general questions on public building law and monument law, on applications, on the applicable planning law and on responsibilities. It also answers questions about the building records archive. By car, a paid parking lot directly in front of the building can be reached via Brinckmannstraße.

No preliminary review by phone

According to the city, the initial advice service does not assess whether a specific project can be approved, nor does it evaluate submitted plans. The office only checks this in an administrative procedure, that is, through a preliminary inquiry or a building application.

03Building application in Düsseldorf: electronically via Bauportal.NRW

Since September 1, 2026, § 70(1) BauO NRW has required building applications to be submitted electronically to the lower building supervision authority. The City of Düsseldorf refers applicants to Bauportal.NRW. According to the city, the portal can be used to apply for a preliminary decision, a building permit including change of use, demolition and a monument permit. A digital pre-check shows which documents are needed and whether an architect must be involved.

  1. 1Determine the procedureCheck whether your project is permit-free, falls under the permit exemption (Genehmigungsfreistellung) or needs a simplified or standard building permit procedure. For residential buildings the simplified procedure under § 64 BauO NRW usually applies.
  2. 2Compile the documentsThe building documents required are set out in the NRW Building Inspection Ordinance (BauPrüfVO). The Building Supervision Office provides completeness checklists for the standard procedure, the simplified procedure, demolition and plot division, plus instructions on how to sort the documents.
  3. 3Submit the applicationSubmit the application via Bauportal.NRW. For buildings, it is usually also signed by a design author authorized to submit building documents (bauvorlageberechtigte Entwurfsverfasserin or Entwurfsverfasser).
  4. 4Track the status onlineAccording to the city, once your application has been registered you receive login details for the Bauherrenauskunft in writing. There you can see the approval status and the correspondence on your procedure.

The building authority checks within ten working days whether the application is complete (§ 71(1) BauO NRW). It generally decides within three months, or within six weeks in the simplified procedure, counted from receipt of complete documents (§ 74(2) BauO NRW). The building permit expires if construction has not started within three years or if work is interrupted for more than a year (§ 75(1) BauO NRW).

According to the city, you must notify the Building Supervision Office in writing one week before construction starts. From the start of construction, the building documents must be kept on site and the construction site sign must be put up.

A change of use usually requires a permit

The city points out that a new use generally requires a new building permit, even without construction work and even after a change of tenant, for example when a grocery store becomes a café or an office becomes a medical practice. Which use is approved is stated in the existing building permit; if you do not have it, the building records archive can help.

04Building without a permit in Düsseldorf: permit-free projects under § 62 BauO NRW

Erecting, altering and changing the use of structures generally requires a permit (§ 60(1) BauO NRW). The projects listed in § 62 BauO NRW are permit-free. The Building Supervision Office does not review them; builders must nevertheless comply with all other public-law rules, such as setback areas and the provisions of a development plan.

Examples of permit-free projects under § 62(1) BauO NRW

Purpose
Garden shed, tool shed
Limit under the law
Up to 75 m³ gross volume without habitable rooms, stables, toilets or fireplaces
Fundstelle
§ 62(1) no. 1 a
Purpose
Garage, carport
Limit under the law
Mean wall height up to 3 m, gross floor area up to 50 m² in total, not in the outer area (Außenbereich)
Fundstelle
§ 62(1) no. 1 b
Purpose
Terrace roof
Limit under the law
Up to 30 m² area and 4.50 m depth
Fundstelle
§ 62(1) no. 1 g
Purpose
Wintergarten
Limit under the law
Up to 30 m² gross floor area for building classes 1 to 3, at least 3 m from the neighboring boundary
Fundstelle
§ 62(1) no. 1 g
Purpose
Solaranlagen
Limit under the law
In, on and attached to roof and exterior wall surfaces, except on high-rise buildings
Fundstelle
§ 62(1) no. 3 a
Purpose
Heat pump
Limit under the law
Permit-free; § 42(7) BauO NRW remains unaffected
Fundstelle
§ 62(1) no. 4 d
Purpose
Walls, fences
Limit under the law
Up to 2 m high, also when fitted with solar panels, not in the outer area
Fundstelle
§ 62(1) no. 7 a
Purpose
Werbeanlagen
Limit under the law
Up to 1 m² in size
Fundstelle
§ 62(1) no. 12
Purpose
Open parking spaces
Limit under the law
Uncovered parking spaces for cars and motorcycles up to 100 m² in total
Fundstelle
§ 62(1) no. 14 c
Source: § 62 BauO NRW 2018 as amended from 09/01/2026, recht.nrw.de, accessed 11/10/2026 · As of 11/2026

For garages and carports, the questions-and-answers page of the Building Supervision Office still gives a limit of 30 m²; the version of the law in force since September 1, 2026 states 50 m². If in doubt, ask the initial advice service. The city generally treats converting an attic into living space as a change of use requiring a permit, even though interior work and installing windows are permit-free in themselves.

Development plan and preservation bylaw take precedence

Development plans, local building bylaws and preservation bylaws can restrict permit-free projects; the city publishes them in Düsseldorf Maps. According to the city, in areas with a preservation bylaw under § 172 BauGB, demolition, alteration and change of use require a permit even if the project would be permit-free under § 62 BauO NRW. The application can be made informally, in at least two copies.

Demolition is also governed by § 62(3) BauO NRW. Permit-free structures and detached buildings of building classes 1 and 3 may be removed without a procedure. Otherwise, demolition must be notified to the Building Supervision Office at least one month in advance, for example the complete demolition of buildings of building classes 2, 4 and 5.

05Preliminary inquiry at the Düsseldorf Building Supervision Office: preliminary decision under § 77 BauO NRW

A preliminary inquiry lets you clarify individual questions about a project in a binding way before you submit the building application, for example whether an apartment building with a certain number of floors is permitted on a plot. The Building Supervision Office records the result in the preliminary decision (Vorbescheid). According to the city, the question clarified is not decided again in the later permit procedure as long as the project does not change significantly. The preliminary decision is valid for three years and can be extended by up to one year at a time on application in text form (§ 77(1) BauO NRW).

  1. 1Phrase the question preciselyThe city advises asking a precise question. The more exactly it is phrased, the more reliable the answer.
  2. 2Submit only the documents neededOnly the information needed to answer the question has to be submitted. The scope is therefore usually smaller than for a building application.
  3. 3Involve a design authorIf the inquiry concerns the construction or conversion of a building, a design author (Entwurfsverfasserin or Entwurfsverfasser) must sign it, according to the city (§ 77(2) BauO NRW).

Which planning law applies to a plot, whether a development plan exists or § 34 BauGB applies, is explained in detail in our guide to the Düsseldorf development plan. The city provides the plans free of charge in Düsseldorf Maps; however, only the preliminary decision answers a question of permissibility in a binding way.

06Fees at the Düsseldorf Building Supervision Office

Fees are based on the NRW Fees Act (GebG NRW) and the NRW General Administrative Fee Ordinance (AVerwGebO NRW). According to the city, the fee for a building permit is 0.6 to 1.3 percent of the assessment basis, depending on the type and specifics of the project. For new buildings and extensions this is the shell construction cost, for alterations to existing buildings the production cost; DIN 276 and DIN 277 apply.

Fees of the Düsseldorf Building Supervision Office according to the city

Benefit
Building permit
Fee
0.6 to 1.3 percent of the shell construction or production cost
Benefit
Deviation, exception or exemption
Fee
Charged separately, up to €5,000 per matter
Benefit
Withdrawn application
Fee
Reduced fee if the substantive review has already begun
Benefit
Construction supervision and inspections
Fee
Percentage of the permit fee, set case by case
Source: City of Düsseldorf, building glossary fees, accessed 11/10/2026 · As of 11/2026

The fee notice is a separate administrative act. You can challenge it before the administrative court; according to the city, you generally still have to pay first. The city does not state a fixed fee for the preliminary decision on its pages.

07Baulasten information in Düsseldorf: geoportal and written extract

A Baulast is a public-law obligation that an owner assumes toward the building supervision authority, for example tolerating an access route or a setback area in favor of the neighboring plot. It takes effect when entered in the Baulasten register and also binds later owners (§ 85(1) BauO NRW). It is usually not recorded in the land register. Anyone who shows a legitimate interest can inspect the register and obtain an extract (§ 85(5) BauO NRW).

  1. 1Check free of charge in the geoportalThe city shows in its geoportal, free of charge and without obligation, whether a plot is encumbered: green means encumbered, brown possibly encumbered, no color not encumbered. Search via the magnifying glass by address or by Gemarkung, Flur and Flurstück, for example “Unterbilk 10 261”.
  2. 2Request written informationIf the parcel is marked green or brown, request the written information by e-mail to baulastauskunft@duesseldorf.de, by fax to 0211 89-29083 or by post to Stadt Düsseldorf, Bauaufsichtsamt, Baulasten, 40200 Düsseldorf.
  3. 3Include the required detailsYou need your postal address, proof of your legitimate interest and, for each plot, the exact designation with Gemarkung, Flur and Flurstück.
  4. 4Notice by postThe notice is sent by post. It costs €30 per unencumbered and €50 to €150 per encumbered plot or parcel. According to the city, no reduction or waiver is possible.

The city does not state a processing time. Buyers should therefore apply early so that the information is available before the notary appointment.

08Inspecting building records in Düsseldorf: building files from the records archive

According to the city, the building records archive holds files on almost all buildings lawfully erected since 1900, with building drawings and often structural calculations. Owners or persons authorized by them request extracts from the building files and appointments for inspection in person via the online form “Termin Akteneinsicht anfragen und Auszüge bestellen”. Proof of ownership and an ID card must be enclosed; applications by phone are not possible.

Fees at the Düsseldorf building records archive

Benefit
Providing a building file per building or property
Fee
€55.00, even if the search finds nothing
Benefit
Inspection by applicants
Fee
€18.00 per 60 minutes or part thereof
Benefit
Paper copy A4 or A3
Fee
€2.00 per page
Benefit
Paper copy A2, A1, A0
Fee
€6.00, €8.00 or €15.00 per page
Benefit
Digital document
Fee
€3.00 per page, regardless of format
Source: Düsseldorf service portal, inspection of building records, accessed 11/10/2026 · As of 11/2026

The city only supplies documents digitally that already exist in digital form, because the archive is being digitized externally step by step. This can temporarily lead to longer processing times. Parties to ongoing approval procedures can inspect the files by appointment through the initial advice service (§ 29 VwVfG NRW).

Before buying: request the building file with a power of attorney

As a prospective buyer you are not yet the owner. Ask the seller for a power of attorney and check in the building file whether extensions such as an attic conversion, an annex or a conservatory are approved and which use is permitted.

09Monument protection in Düsseldorf: the lower monument protection authority within the Building Supervision Office

In Düsseldorf the lower monument protection authority is the Institute for Monument Protection and Preservation, division 63/4 of the Building Supervision Office, also at Brinckmannstraße 5. According to its own information, it looks after more than 1,800 architectural and archaeological monuments and ten monument areas. Phone hours are Tuesdays from 9 a.m. to 12 noon via the central number 0211-8991; appointments are available by arrangement, e-mail denkmalschutz@duesseldorf.de.

According to the city, every structural or design change to a monument requires the permission of the lower monument protection authority. This includes conversion, extension and demolition, but also roof covering, facade painting, window replacement and a change of use. Construction work in the immediate vicinity of a monument or in a monument area may also require a permit. The theme map “Bau- und Gartendenkmäler” in Düsseldorf Maps shows where monuments are located.

The legal basis is the NRW Monument Protection Act (Denkmalschutzgesetz NRW), which has applied in a new version since June 1, 2022. The city provides forms for the monument permit, the tax certificate and monument funding. The permit can also be applied for via Bauportal.NRW.

10Neighbors, construction noise and defects: when the Building Supervision Office helps

Before the Building Supervision Office approves deviations or exceptions that may affect interests protecting neighbors, it generally notifies the adjoining owners (§ 72 BauO NRW). Setback areas are a typical case. According to the city, anyone who signs the plans and thereby consents is bound by this; legal successors cannot later raise objections to the building either.

Who is responsible for what in Düsseldorf

Matter
Structural or fire safety hazard, such as a damaged balcony or a blocked stairwell
Responsible according to the city
Building Supervision Office, Tuesdays 9 a.m. to 1 p.m. at 0211 89-26481
Matter
Serious housing defects such as no heating or damp walls, if the landlord does not respond
Responsible according to the city
Wohnungsamt
Matter
Construction noise outside permitted hours
Responsible according to the city
Environmental Office (Umweltamt); at night the public order and service team (Ordnungs- und Servicedienst)
Source: City of Düsseldorf, Building Supervision Office, questions and answers, accessed 11/10/2026 · As of 11/2026

According to the city, noisy demolition and construction work is only permitted Monday to Saturday from 7 a.m. to 8 p.m.; exceptions are approved by the Environmental Office. Construction next door is lawful if there is a building permit or the project is permit-free. Details of the project are shown on the construction site sign with a red dot, which must be visible from outside. Disputes between tenant and landlord, by contrast, are a matter of civil law.

Frequently asked questions

F-01

Where is the Bauamt in Düsseldorf?

The Building Supervision Office of the state capital is located at Brinckmannstraße 5, 40225 Düsseldorf. The central application intake (Zentrale Antragsannahme) is at Auf'm Hennekamp 45, ground floor, room 20. The nearest stop is Auf'm Hennekamp.

F-02

How do I reach the Düsseldorf Building Supervision Office by phone?

Through the initial advice service at 0211 89-22999, Monday to Friday from 8 a.m. to 2 p.m., or by e-mail to bauaufsichtsamt@duesseldorf.de. On-site or video appointments are arranged by agreement.

F-03

How do I submit a building application in Düsseldorf?

Since September 1, 2026, building applications must be submitted electronically; the city refers to Bauportal.NRW. The completeness checklists of the Building Supervision Office show which documents are needed. You can then track the status in the Bauherrenauskunft.

F-04

Do I need a permit for a garden shed or a carport in Düsseldorf?

A garden shed up to 75 m³ gross volume without habitable rooms is permit-free under § 62 BauO NRW, as are garages and carports with a mean wall height of up to 3 m within the statutory area limit. The development plan, bylaws and setback areas still apply.

F-05

How much does Baulasten information cost in Düsseldorf?

€30 per unencumbered and €50 to €150 per encumbered plot or parcel. Whether a Baulast exists at all is shown in advance in the city's geoportal, free of charge and without obligation.

F-06

How do I get the building file for my house in Düsseldorf?

Through the online form of the building records archive, with proof of ownership and ID card, or as an authorized representative. Providing the building file costs €55, inspection €18 per hour or part thereof; copies and digital pages are charged extra.

F-07

Who is responsible for monument protection in Düsseldorf?

The Institute for Monument Protection and Preservation within the Building Supervision Office is the lower monument protection authority. It can be reached by phone on Tuesdays from 9 a.m. to 12 noon and by e-mail at denkmalschutz@duesseldorf.de.

No legal or tax advice

This guide provides a general overview and does not replace legal or building advice. The applicable building law, the development plan and the decision of the Building Supervision Office of the state capital Düsseldorf are authoritative.

Next steps and background

Data sources

Official source · Our own calculation · Our own analysis · DDORF estimate → Methodology

  • Official sourceLandeshauptstadt Düsseldorf: BauaufsichtsamtAddress, central application intake, initial advice, e-mail, service overviewduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceBauaufsichtsamt Düsseldorf: ErreichbarkeitInitial advice, phone hours, fax, directions by bus and railduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceBauaufsichtsamt Düsseldorf: AnsprechpartnerDivisions 1 to 4 and their tasksduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceServiceportal Düsseldorf: Erstberatung, allgemeine BauberatungScope of service, appointments by arrangement, contactservice.duesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceBauaufsichtsamt Düsseldorf: Fragen und AntwortenPermit-free projects, change of use, electronic submission, preservation bylaw, demolition, neighbors, construction noiseduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceBauaufsichtsamt Düsseldorf: VollständigkeitsprüflistenChecklists for approval procedures, demolition and plot divisionduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceBauaufsichtsamt Düsseldorf: BauherrenauskunftApproval status and correspondence onlineduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceBauaufsichtsamt Düsseldorf: BauvoranfragePreliminary decision, documents, design authorduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceBauaufsichtsamt Düsseldorf: GebührenAssessment basis, fee rate, deviations, withdrawalduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceBauaufsichtsamt Düsseldorf: BaubeginnNotice one week in advance, building documents on siteduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceBauaufsichtsamt Düsseldorf: BaulastenauskunftDisplay in the geoportal, colors, searchduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceBauaufsichtsamt Düsseldorf: Baulastenauskunft schriftlichWays to apply, required details, fees, delivery by postduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceBauaufsichtsamt Düsseldorf: BauaktenarchivRecords since 1900, extracts and inspectionduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceServiceportal Düsseldorf: BauakteneinsichtEligible persons, proof, fees, digitizationservice.duesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceLandeshauptstadt Düsseldorf: Denkmalschutz und DenkmalpflegeLower monument protection authority, division 63/4, number of monuments, phone hours, contactduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceBauaufsichtsamt Düsseldorf: Denkmalschutz im BaulexikonMeasures requiring a permit, formsduesseldorf.deAccessed 10 November 2026View source(opens new window)
  • Official sourceBauportal.NRWDigital building application and preliminary decision in North Rhine-Westphaliabauportal.nrwAccessed 10 November 2026View source(opens new window)
  • Official sourceLandesbauordnung 2018 NRW§ 57 building supervision authorities · §§ 60, 62 permit-free projects · § 63 permit exemption · §§ 70, 71 building application · § 72 neighbor participation · §§ 74, 75 building permit · § 77 preliminary decision · § 85 Baulastenrecht.nrw.deAccessed 10 November 2026View source(opens new window)

As of · Legal information: 11/2026 · Source: DDORF WOHNEN editorial team