Knowledge and tools

House-sale handover record: template to complete

Free work template for the real estate handover: record meter readings, keys, condition, documents and open points and print as a PDF.

Illustration (AI generated): Meters and keys when preparing a handover; symbolic illustration
Directly to the calculator/check

Last updated: 08.10.2026 · By DDORF WOHNEN · Software development and editorial work

Handover record — working template

Free and without registration. This tool does not send your entries to the server. You can copy, print or download the draft, or choose to save it in this tab.

Optional: save the draft in this browser tab only. This tool does not send it to the server. Photos are not included.

Without tab storage, unsaved changes are lost on reload. Continue to save files and photos yourself.

Text preview
Handover record — working template

Property and handover date: ________________

Persons handing over and taking over: ________________

Electricity: meter number and status: ________________

Gas / heat: meter number and status: ________________

Water: meter number and level: ________________

Keys handed over and number: ________________

Condition, known defects and photo evidence: ________________

Documents handed over: ________________

Open points and agreed deadlines: ________________

Signatures of those involved: ________________

Work template without examining the individual case. No publication, no inquiry and no contract concluded via DDORF.

When is the protocol needed?

The protocol records what those involved document during the actual handover. The timing, transfer of ownership and requirements depend on the agreed purchase contract. Coordinate the handover with the notary and those involved; a completed protocol does not replace a purchase contract or a change in the land register.

Record meter readings and keys specifically

Write down the number, status, unit and reading date for each meter. Record keys by type and number, including side rooms and mailboxes. Photos can help as separate evidence; clearly note which recording belongs to which point.

Don't just leave open points verbally

Describe an open issue in a comprehensible manner, with responsibility and an actually agreed deadline. Empty fields do not mean confirmation that there are no defects. Legal declarations, waivers of liability or new guarantees should not be included in a work template without being checked.

Fill out and sign

Create the draft in the browser, print it or save a PDF. Check it together on site and have the final version confirmed by those involved. The template includes space for signatures; DDORF does not carry out electronic signatures or proof of identity.

Related tools and background information

Data sources

Official source · Our own calculation · Our own analysis · DDORF estimate → Methodology