DDORF WOHNEN
New-build project · Mülheim an der Ruhr

Parkstadt Mülheim (ehem. Tengelmann-Areal) – new build in Mülheim an der Ruhr-Broich/Speldorf

As of: 10 November 2026

in planning · rental apartments / subsidized housing (geförderter Wohnungsbau)

Illustration (AI generated): Aquarius water tower with external staircase · stylized according to photo reference
Own compilation

About the project

On the former Tengelmann headquarters site of about 13 hectares on Wissollstraße, between Broich and Speldorf, SORAVIA is planning Parkstadt Mülheim through a project company. It is based on an urban design competition decided in 2021; the revised master plan provides for roughly 650 to 680 homes, including small units for seniors and students. About ten percent of the living space is to be publicly subsidised. Zoning plan Y 13 has not yet been adopted: in 2026 the procedure was paused and a public dialogue began with an information evening on 19 May 2026. No construction start has been set. The concept includes a public park with a lake.

New-build projects

Project facts

Each line names its source and the date on which we checked the fact there. If a line is missing, no source has published that fact.

Project facts

Item
Developer
Value
SORAVIA (W. Campus Quartiersentwicklung Grundstücks GmbH, Projektgesellschaft der SoReal Deutschland GmbH)
Item
Location
Value
Mülheim an der Ruhr-Broich/Speldorf, Wissollstraße / Veilchenweg (ehem. Tengelmann-Stammareal)
Item
Type
Value
rental apartments / subsidized housing (geförderter Wohnungsbau)
Item
Apartment types
Value
Apartments for families, couples, singles, seniors and students
Item
Project stage
Value
in planning · Competition decided in 2021; zoning plan „Parkstadt Mülheim – Y 13“ in preparation (resolution to draw up the plan 24.05.2022); in 2026 provisional halt of the procedure and dialogue process (information evening 19.05.2026)
Source
Stadt Mülheim an der Ruhrchecked 10 November 2026

No individual listings: we do not show individual apartments, floor plans, photos or prices per apartment. Only the provider can confirm whether apartments are still available, what they cost and when they will be completed.

MaBV · § 556f BGB · WBS

Context

The project is still in planning. Number of units, apartment mix and dates may change until the building permit; what counts is the current status at the city and the developer.

For the subsidized apartments you need a housing entitlement certificate (WBS). They are allocated directly by the housing company; register there as a home seeker.

New-build projects

More new-build projects in Mülheim an der Ruhr-Broich/Speldorf

More new-build projects in Mülheim an der Ruhr-Broich/Speldorf

Location
Heißen
Developer
SWB Mülheim an der Ruhr (städtische Wohnungsgesellschaft)
Units
182
Type
rental apartments / subsidized housing (geförderter Wohnungsbau)
Stage
under construction
Completion
Phase 1: 2027

Is a fact wrong or out of date? Report content

Data sources

Official source · Our own calculation · Our own analysis · DDORF estimate → Methodology

As of · Source: developers, cities and press